I am waiting for eomgc 10gR2 for AIX so I check the download page often. Instead of adding new plateforms, I notice they just removed Solaris !
Oracle Enterprise Manager 10g Grid Control Release 2 (10.2.0.1) for Solaris Operating System (SPARC)
google cache
This entry was posted
on Wednesday, February 1st, 2006 at 10:11 and is filed under oracle, news, OEM, installation.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.
Post to :
del.icio.us
- Digg it
- Furl
- reddit
- Spurl
February 1st, 2006 at 17:51
Well, that’s comforting after deploying the 10.2.0.1 Solaris Agent. I’ve also been waiting for the 10.2 AIX eomgc, and haven’t been able to get any response from Oracle about the release schedule. This effectively prevents us from deploying Grid Control, except to Linux.
February 1st, 2006 at 21:57
well, I suppose oemgc 10.2 will probably not come before February